Before


Before


Before


After


Project: Lake Mary High School - Reroofing
School District of Seminole County, Florida

Size: 213,000 square feet
Roof System/Systems: 2 Ply Built Up Roof with Modified Bitumen Cap Sheet and concrete deck
Budget Amount: $1,200,000
Bid Amount: $779,997
Change Orders: $(187,657)
Final Cost: $592,340
Final Cost/Sq. Ft.: $2.78

Project Summary:
This successfully completed project in Lake Mary, Florida consisted of the reroofing of the entire campus (212,000 square feet) with a Three-Ply Built-Up Roof with Modified Bitumen Cap Sheet, installation of raised expansion joint curbs, and redesign and installation of electrical surge suppression system.

Also included was masonry renovation work to adjacent brick walls to properly install through-wall cavity flashing and counterflashing for the new roof membrane and some renovation work to prefabricated metal wall panels. Non-functioning rooftop power ventilation system units were repaired and restored before being reinstalled over the new roof system and provided assistance to Mechanical Engineer during installation of second chiller system.

The building remained in continuous operation during design and construction.