Project:
Horizon
Elementary School - Reroofing
School Board of Volusia County
Size: 102,000
square feet
Roof System/Systems: 24 gage Standing Seam Galvalume Metal
Roofing
Budget Amount: $783,870
Bid Amount: $780,300
Change Orders: $3,570
Final Cost: $788,400
Final Cost/Sq. Ft.: $7.59
Project
Summary:
The scope of work for this project included the design of reroofing
of 102,000 square feet of 24 gage standing seam galvalume metal
roofing over 1½" metal deck.
This entire campus was
new construction 1988, and had water infiltration problems from
that point in time. The standing seam metal roof was the source
of the problems. We conducted an investigation of the existing conditions
and compiled a report on the conditions, including recommendations
for repair of the original metal roof.
Due to the installation
methods used, the most cost effective course of action was to remove
and replace the entire 102,000 square foot, 7 year old metal roof.
The new metal roof system moved the gutter to the outside edge and
introduced a modified bitumen underlayment where there was none
previously.
|